Fabric pre-staging
Agree port maps, breakout settings, optics and the software baseline. Prepare the approved underlay and overlay configuration and define acceptance checks.
JUNIPER ENGINEERING
Deploy and retire Juniper QFX infrastructure with attention to fabric dependencies, physical connectivity and validation. Compritech supports pre-staging, commissioning, hardware changes and decommissioning for data centre switching projects.
Agree port maps, breakout settings, optics and the software baseline. Prepare the approved underlay and overlay configuration and define acceptance checks.
Validate physical links and routing adjacency. Check EVPN-VXLAN, MTU, endpoint reachability and redundancy where supported and included in the customer design.
Review attached servers, peer links, routing and overlay dependencies before withdrawing a switch. Reconcile hardware and sanitise device storage before the agreed reuse or disposal route.
Discuss commissioning, support, migration or decommissioning for the following QFX platforms. The catalogue includes both newer and legacy equipment; the exact work is scoped against your model, software release and support status.
QFX10002-36Q, QFX10002-72Q, QFX5100-24Q, QFX5100-24Q-AA, QFX5100-48S, QFX5100-48T, QFX5100-96S, QFX5110-32Q, QFX5110-48S, QFX5120-32C, QFX5120-48T, QFX5120-48Y, QFX5120-48YM, QFX5130-32CD, QFX5130-48C, QFX5130-48CM, QFX5130E-32CD, QFX5200-32C, QFX5200-48Y, QFX5210-64C, QFX5220-128C, QFX5220-32CD, QFX5230-64CD, QFX5240-64OD, QFX5240-64QD, QFX5241-32OD, QFX5241-64OD, QFX5241-64QD
Send the full model and serial details so we can confirm project suitability. Power, airflow, PoE, port and chassis variants are checked against the required work during scoping.
Resident Engineer experience working for Juniper in Italy on the Telecom Italia account.
Resident Engineer experience supporting the 2026 Winter Olympics in Italy.
Around nine years of Fujitsu technical leadership and escalation management across the Ministry of Defence account.
Experience shown relates to Compritech’s founder, Tosin Otuniyi, in previous roles.
Send your hardware models, Junos release, device quantity, site location and required outcome. For deployment, include the approved design and acceptance criteria. For retirement, include the dependencies, change approval requirements and desired asset outcome.
Model references were checked against Juniper product comparisons and hardware documentation on 9 October 2026. Product availability and support dates change; check the exact model before selecting a deployment or retirement plan.
Send your device models, site location, Junos version, timescale and the work required. We will agree the technical scope, access arrangements and completion criteria with you.